Rough Grading of Portions of the Twinning of the Trans Canada Highway in Banff National Park, Banff, Alberta.

Commencement : October 1, 2005 - Phase II commences : June 2006
This page and links will be updated on an on-going basis.

Banff TCH Twinning

Arthon was awarded the contract in November 2006 comprising Rock Blasting on the North Side of the Highway from approximately km 74.180 to km 74.4, loading and hauling of Rock to the South side of the highway, constructing and shaping of stockpile between km 74.230 to 74.320, and winter maintenance from km 73.7 to 74.9.
 
Arthon was awarded the $9.9MM second contract in June 2006 to finish rough grading and rock removal, to lay gravels, and to pave a major portion of the new twinned highway for 6 km. This highway will remain 2 lanes until further work in 2007 to complete.
 
Arthon was awarded the $6.9MM contract to complete roughly 10 km of rough grading and rock removal commencing just south of Lake Louise, Alberta. This project includes the drilling, blasting, and hauling of over 60,000 m3++ of rock. A further 250,000+ m3 of earth requires removal and placement in specific fill areas.
Bear Animation Bear Animation

Click for Project Air Photo (253K bytes) - scroll POP-UP window to see entire length :
 
Arthon's key individuals who will run and complete this project :
  • Mr. Guy Ferrari, Project Superintendent
  • Mr. Graham Bennison, Project Manager
  • Mr. Steve Dimond, M.Sc., P.Eng., Project Engineer & Administration
  • Mr. Kerry Leong, Coordination and Troubleshooting

Project Information & Updates

(look for more information here as project continues)
 

 

 

Arthon Construction Ltd.
PO Box 29001,
Okanagan Mission
Kelowna, British Columbia
Canada, V1W 4A7
Tel: (250) 764-6144
Fax: (250) 764-6143
Email Arthon

 
Arthon Construction Ltd.  (250) 764-6144    www.arthon.com